home/consulting/case studies/study 12 about us news events newsletter links careers site map legal wildegroup
home solutions demo-room software consulting training support finance clients contact

Case Studies, Papers & Promotions
Channel Tunnel Rail Link: North Downs Tunnel Analysis by Wilde FEA

12 February 2002

Phased analysis capabilities within DIANA nonlinear FEA software have been used to model the staged nature of the NATM excavation process during the construction of the Channel Tunnel.


Download Case Study | Previous Case Study | Next Case Study


back to top T: +44 (0)161 4747479 - E: info@WildeFEA.co.uk Copyright © 2006 Wilde FEA Ltd