Channel Tunnel Rail Link: North Downs Tunnel Analysis by Wilde FEA
12 February 2002
Phased analysis capabilities within DIANA nonlinear FEA software have been used to model the staged nature of the NATM excavation process during the construction of the Channel Tunnel.